We're excited to launch Rebond 300, the world’s first carbon-negative construction material with an EPD-verified footprint of -149 kg CO₂ per tonne. It marks the latest addition to our Rebond series of carbon-negative construction materials, representing a 10x improvement in net carbon performance compared to our first-generation product. Every tonne of material we produce now removes significantly more CO₂ from the atmosphere than is emitted during its entire production process.
Download Paebbl Rebond 300 verified EPD here
Rebond 300 is not an iteration on existing construction materials. It is a fundamentally different class of product.
>> In Other News: Commissioner Hoekstra Brings Industry Together to Accelerate Implementation of Carbon Capture and Storage Across Europe
Where conventional construction materials are optimised to reduce their carbon footprint, we’ve manufactured Rebond 300 to remove carbon from the atmosphere and lock it permanently into the built environment. Paebbl’s mineralisation process captures and locks away CO₂ in a stable mineral form that will remain sequestered for geological timescales, inside the structures we build today.This is what the next generation of construction materials looks like. Every building, every foundation that incorporates Rebond 300 becomes a permanent carbon sink, contributing to Scope 3 targets through the physical chemistry of the material itself.The construction industry has long been framed as one of the hardest sectors to decarbonise. Rebond 300 reframes that entirely. Real estate turns into the mechanism through which gigaton-scale carbon removal becomes possible, embedded invisibly into the infrastructure the world is already building.Performance and aesthetics with no trade-offs for the value chain
Unlocking architectural and visual concrete applications: Rebond 200 (left) Rebond 300 (right)
Rebond 300 can replace up to 30% of cement in concrete mixes without compromising structural performance. Its near-white finish opens applications across exposed concrete, architectural elements, and facade systems.
For architects and specifiers, this unlocks a new level of environmental and aesthetic design. They finally have a material that brings both the lowest verified embodied carbon on the market and the aesthetic range to match the ambition of their projects.
Every tonne of Paebbl Rebond 300 added to concrete mixes constitutes verified CO₂ removal, a permanent mineral sequestration embedded in the resulting concrete structure. That is a dual value proposition the market has not had before: a high-performance construction material that simultaneously functions as a carbon removal instrument, entering the value chain without requiring changes to equipment or production infrastructure.
The -149 kg CO₂/t footprint is the result of continuous process optimisation in our mineralisation technology. It is backed by a full EPD under recognised European standards. When our customers specify Rebond 300, the numbers hold up to scrutiny.
From material producers integrating a verified carbon-negative product into their portfolio, to RMX plants differentiating on embodied carbon, to contractors and developers who need Scope 3 performance that is real and reportable, we now want to build the reference cases that set the standard for this industry.
Follow the money flow of climate, technology, and energy investments to uncover new opportunities and jobs.
Inside This Issue 📋 GAO Report Flags Oversight Gaps in 45Q Carbon Capture Credit 💰 Google Opens 2026 R&D Awards Offering $6M+ for Carbon Removal and Superpollutant Research 🌍 NEOM Green Hydrog...
Inside This Issue 🪟 Cardinal Glass to Deploy World's First Carbon Capture System at Float Glass Plant 🔬 SunHydrogen's Solar-to-Hydrogen Modules Exceed 10% Efficiency in SPARC Testing, Advancing to...
Inside This Issue 🔋 American Airlines Flies First Commercial Passenger Flight on Infinium eSAF 🌬️ Isometric Signs Its First Carbon Removal Projects in China ♻️ Soil Carbon Market Gains Momentum as...
KBR Selected by ORNX for Low-Cost Ammonia Pre-FEED Study Supporting Landmark Morocco Project
HOUSTON, August 12, 2026 – KBR (NYSE: KBR) announced today that it has been selected by ORNX Green Hydrogen for the pre-front-end engineering design (Pre-FEED) phase of a world-scale, low cost ammo...
NEOM Green Hydrogen Megaproject Enters Commissioning Ahead of 2027 Start
Construction of the $8.5 billion NEOM Green Hydrogen Project is complete, with commissioning under way ahead of planned commercial operations in 2027 Construction work on the $8.5 billion NEOM Gre...
Hystar and Bharat Heavy Electricals Limited (BHEL) — one of India’s largest state owned engineering and manufacturing enterprise in the energy and infrastructure sectors — have signed a Strategic C...
Isometric Expands Carbon Removal Certification to China
Isometric has signed its first three carbon removal project developers in China, covering direct air capture and biochar. China may need about 3 billion tonnes of carbon removal annually to re...
Follow the money flow of climate, technology, and energy investments to uncover new opportunities and jobs.