Published by Todd Bush on September 7, 2022
September 07, 2022 06:00 AM Eastern Daylight Time
NEWPORT BEACH, Calif.--(BUSINESS WIRE)--Clean Energy Fuels Corp. (NASDAQ: CLNE), the largest provider of the cleanest fuel for the transportation market, supplied fuel for the first bunkering with liquified natural gas (LNG) of Pasha Hawaii's new container ship MV George III. This was the first LNG bunkering of a container ship on the U.S. West Coast. Clean Energy worked with World Fuel Services and West Coast Clean Fuels to supply the ship with over 300,000 gallons of the clean fuel.
>> In Other News: McDermott Awarded FEED Contract From Gunvor Petroleum
Pasha Hawaii's MV George III, a 774-foot container ship operating between Long Beach, CA, Honolulu, HI, and Oakland, CA, is the first of three LNG-powered ships that the domestic shipping company is putting into service. The three ships are expected to consume 105 million gallons of LNG fuel over the next five years.
"The air quality around the Ports of Long Beach and Los Angeles is some of the worst in the country because of in large part the very dirty marine fuels that have been traditionally used by container ships," said Andrew J. Littlefair, president and CEO, Clean Energy. "The move by Pasha to add ships that operate on clean-burning LNG is one the most forward-thinking and environmentally-progressive actions taken in the maritime industry. We congratulate Pasha on their first successful bunkering operation and look forward to many more as Pasha continues to add the other LNG-powered ships to their fleet."
LNG-powered ships achieve 99.9 percent reduction in diesel particulate matter and sulfur oxide emissions, 90 percent less nitrogen oxides and a 25 percent reduction in carbon dioxide compared to ships running on traditional fuels.
The LNG that powers the Pasha Hawaii container ships is supplied by the Clean Energy plant in Boron, CA, the only one of its kind in the state. Because of the increase in demand for LNG by Pasha and others, Clean Energy is in the process of expanding its Boron LNG plant by adding a third production train, which will increase capacity by 50 percent when completed.
The MV George III is scheduled to bunker every second week at the Port of Long Beach. The second Pasha ship to operate on LNG, the Janet Marie, is expected in late 2022. The third Pasha ship is expected to be deployed in mid-2023.
Before the MV George III arrived at the Port of Long Beach, Clean Energy supported Pasha in the commissioning of the ship. Clean Energy worked at the shipyard in Brownsville, Texas to cool down the ship's LNG storage tank to cryogenic temperature and then performed two bunkering operations to load LNG into the ship tanks. The LNG was provided from Clean Energy's Pickens LNG Plant in Texas.
Clean Energy Fuels Corp. is the country's largest provider of the cleanest fuel for the transportation market. Our mission is to decarbonize transportation through the development and delivery of renewable natural gas (RNG), a sustainable fuel derived from organic waste. Clean Energy allows thousands of vehicles, from airport shuttles to city buses to waste and heavy-duty trucks, to reduce their amount of climate-harming greenhouse gas. We operate a vast network of fueling stations across the U.S. and Canada. Visit www.cleanenergyfuels.com and follow @ce_renewables on Twitter.
Follow the money flow of climate, technology, and energy investments to uncover new opportunities and jobs.
Inside This Issue 🍁 North Star Carbon Removal Project Selected by Government of Canada for Landmark Carbon Removal Procurement Program 🚢 Trafigura Ship Fuel Venture Isn't Rushing Into Alternative ...
Inside This Issue 🔋 Molten Industries Commissions World’s First Plant to Produce Battery-Grade Graphite from Natural Gas 🪨 European Commission Presents Draft Rules for Certifying Enhanced Rock Wea...
Inside This Issue ⚙️ GE Vernova’s Greenville Lab Moves Turbines Closer to 100% H2 🚗 Geely Holding Announces Evsa’s Global Launch at COP31 🚢 Ethanol Blends Run Successfully in Pilot Marine Engine T...
Nordic Ren-Gas Reaches Final Investment Decision on Tampere E-Methane Facility
Nordic Ren-Gas (Ren-Gas), a Taaleri development capital investment since December 2025, has reached the Final Investment Decision (FID) on its renewable e-methane production facility in Tampere, Fi...
COP31 Draft Drops Fossil Fuel Language as Talks Near Deadline
Greenpeace activists unveil a three-dimensional floor installation titled “Don’t Fall for Fossil Fuels” at the U.N. Climate Change Conference (COP31) in Antalya, Turkey, Novembe...
Download the release PowerCell Group has, through its U.S. subsidiary PowerCell Inc., signed an agreement worth SEK 440 million with an established U.S.-based electric cooperative for a utility-sc...
Integrated solution simplifies execution and reduces project risk to support the production of up to 140,000 MTPA of eSAF CHARLOTTE, N.C., Nov. 18, 2026 — Phelan Green, through its clean fuels sub...
Follow the money flow of climate, technology, and energy investments to uncover new opportunities and jobs.